1. Traffic, Plant & People

1.5 Verify all plant is fit for purpose and safe to operate prior to coming to site

RISK – Plant not fit for purpose

Confirm that plant is fit for purpose and safe to operate using the guidance in the Plant Use section of the Plant and Equipment Procedure.

 

 

 

Rolling Stock must comply with the Rail/JH Infrastructure Manager’s Rolling Stock Acceptance Processes (Procedure linked below).

 

 

 

Before plant can be used on site, there are a number of requirements which must be met, including:

  • Completion of a Plant Hazard & Risk Assessment Worksheet (PHA) or Rail Rollingstock PHA
  • Completion of a  Plant Pre-Acceptance Checklist
  • Registration of plant on the workplace Plant & Equipment Register
  • Placement of a  workplace plant & equipment tag (for plant onsite > 1 week)
  • Evidence of up to date service history including major inspections (if required)

 

 

Plant Pre-Acceptance Checklists verify controls required for the safe operation of the plant are in place. This check is undertaken prior to plant being approved for use on site. The Plant Pre-Acceptance Checklist Index (in the Plant and Equipment Procedure) contains links to a series of plant specific Pre-Acceptance Checklists. For plant or equipment that does not have a specific Pre-Acceptance Checklist, the Condition of Plant Pre-Acceptance Checklist must be used.

 

 

 

Plant and Equipment Register must be maintained for all plant and equipment. 

 

 

A plant and equipment tag / sticker must be applied to the plant once all documentation has been provided and verified, with the exception being for short term dry or wet hire plant which will be on site for less than 7 days. All appropriate checks must still be completed regardless of how long the plant operates on site.

 

Example of a John Holland Plant Sticker:

 

 

All plant must also be inspected, serviced and maintained in accordance with the manufacturer and supplier recommendations.

 

 

 

Related GMRs
1.6 Ensure any plant modified outside of manufacturer’s specifications is engineered, certified and approved by a competent authorised person

 

Related Procedures and Forms
Plant and Equipment Procedure
Plant Pre-Acceptance Checklist
Plant Hazard Risk Assessment Worksheet (PHA)
Rolling Stock Plant Hazard Risk Assessment Worksheet (PHA)
Rail - Rolling Stock Acceptance Procedure


© John Holland Pty Ltd.

GMRs

  • Home
  • About the GMRs & this site
    • What are the GMRs?
    • What do the GMRs include?
    • Implementing the GMRs
    • Our GMR Videos
  • 1. Traffic, Plant & People
    • 1.1 Separating vehicles
    • 1.2 Overhead services and structures
    • 1.3 Pedestrian Separation
    • 1.4 Working in Operating Zones
    • 1.5 Fit for purpose plant
    • 1.6 Plant Modification
    • 1.A Licence and Verification
    • 1.B Road and rail rules
    • 1.C Seating position & seat-belts
    • 1.D Spotters
    • 1.E Operating zone permissions
    • 1.F Positioning plant
  • 2. Excavation & Trenching
    • 2.1 Excavation design
    • 2.2 Services and Structural Drawings
    • 2.3 Zone of Influence
    • 2.4 Barricading and Signage
    • 2.5 Services within 5m
    • 2.6 Tunnelling Controls
    • 2.A Positive Service Location
    • 2.B Access requirements
    • 2.C Safe Approach Distances
    • 2.D Excavation inspections
    • 2.E Preventing unauthorised access
  • 3. Lifting Operations
    • 3.1 Lift Competencies
    • 3.2 Lift Designer
    • 3.3 Ground Bearing Capacities
    • 3.4 Inspections & Maintenance
    • 3.5 Mobile plant load limits
    • 3.6 Lifting site inspection
    • 3.A Pre-Start Inspections
    • 3.B Mobile Plant used for lift
    • 3.C Exclusion zones
    • 3.D Suspended Loads
    • 3.E Competent Person(s)
  • 4. Electrical Safety
    • 4.1 Licences for Electrical Work
    • 4.2 Live electrical systems
    • 4.3 Safe System of Work
    • 4.4 Protective devices
    • 4.A Treat as Live
    • 4.B Legislative Requirements
    • 4.C Safe working distance
    • 4.D Electrical Supply Panels
  • 5. Work at Height
    • 5.1 Fall from height
    • 5.2 Falling objects
    • 5.3 Penetrations, shafts & risers
    • 5.4 EWP Protection Devices
    • 5.5 Grid Mesh / Chequer Plates
    • 5.A Barricades and exclusion zones
    • 5.B Overloading & adjustments
    • 5.C Harnesses
    • 5.D Installing roof sheeting
    • 5.E WAH Training
    • 5.F Accessing vehicles
  • 6. Wellbeing
    • 6.1 Wellbeing Risk Management
    • 6.2 Work rosters & Wellbeing programs
    • 6.3 Facility maintenance
    • 6.4 Occupational Hygiene
    • 6.5 AOD monitoring
    • 6.6 Wellbeing Champions
    • 6.A Be fit for work
    • 6.B Notify if unfit
    • 6.C Supportive work environment
    • 6.D Wellbeing Training
    • 6.E Know your Champions
    • 6.F Wellbeing Events
  • 7. Temporary Works
    • 7.1 Temporary Works Coordinator
    • 7.2 Temporary Works register
    • 7.3 TW Competencies
    • 7.4 Design Controls
    • 7.5 Temporary Work Protection
    • 7.6 Communication
    • 7.A Installation and Removal
    • 7.B Site validation
    • 7.C Working Load Limits
    • 7.D Inspection Schedule
    • 7.E Alterations
  • 8. Isolation
    • 8.1 Identifying Energy Sources
    • 8.2 Identifying Risks
    • 8.3 Isolations competencies
    • 8.4 Isolation Points
    • 8.5 Identifying Stored Energy
    • 8.A Test before touch
    • 8.B Releasing Stored Energy
    • 8.C Reviewing Isolation Status
    • 8.D Monitoring Isolation Controls
    • 8.E Re-instate guards
    • 8.F Personal Danger Tags/Locks
  • 9. Environmental Management
    • 9.1 Identifying risks
    • 9.2 Approvals/Licences/Permits
    • 9.3 Implementing Controls
    • 9.4 Identifying heritage, flora and fauna
    • 9.5 Minimising Resource Use
    • 9.6 Spoil and waste classification
    • 9.A Sensitive areas & boundaries
    • 9.B Dust, noise & vibration
    • 9.C Waste & hazardous substances
    • 9.D Maintaining / reviewing controls
    • 9.E Environmental findings
    • 9.F Water discharge
  • 10. Work on Rail
    • 10.1 Rail Competencies
    • 10.2 Qualified worker responsibilities
    • 10.3 Worksite Protection Risk Assessment
    • 10.4 Worksite Protection Plan
    • 10.5 Implement controls
    • 10.A Rail compliant PPE
    • 10.B Pre-work brief
    • 10.C Confirm protection controls
    • 10.D Network rules & safety instructions
    • 10.E Review Worksite Protection Plan
    • 10.F Rail certification
  • Knowledge Requirements
  • Glossary