5. Work at Height

5.1 Identify all tasks in which a person may potentially fall from height and implement appropriate control measures

RISK – Falls from heights

Examples of protecting people - undertaking work from the ground or using a fall prevention devices (e.g. scaffolds, MEWPs, perimeter screens). 

 

 

 

Many of our work at height incidents take place because someone has moved or climbed over edge protection to get access to a particular area. Plan work appropriately and make sure no one needs access to areas outside of the edge protection boundaries. If access to this area is required, stop and work together to decide on a safe method for accessing the area.

 

 

The Hierarchy of control must be applied when planning work at height activities.

 

Work at height Hierarchy

 

 

 

Working at height risks need to be identified and controlled as early as possible in the project planning phase.  Applying safety in design principles and ensuring full implementation of our SQE Risk Management process will seek to eliminate the risk of work at height.

 

 

 

 

 

Perimeter Screens

  • The perimeter of structures, edges and working platforms must be protected by screens, guard rails and / or scaffolding systems to prevent persons or materials falling
  • Screens should be installed, jumped and dismantled by competent persons who are trained in the specific type of screen system and in accordance with the manufacturers instructions
  • Screens are not to be jumped until the lowest floor has suitable edge protection installed. Screens should extend a minimum of 2m above the highest working floor
  • Perimeter screens should be designed to ensure all gaps are fully closed between the screen and the respective floors

 

 

 

 

 

 

 

Scaffolds

  • Scaffolds above 4m must be erected, dismantled or altered by a scaffolder with a high risk work license who has been verified as competent in accordance with the John Holland VOC procedure
  • Scaffold is considered Temporary Works and must therefore, be installed in accordance with the John Holland Temporary Works Procedure and Temporary Works GMR (GMR 7)
  • All working platforms must be at least 450mm wide

Scaffolds must be inspected by a qualified scaffolder and tagged:

  • Prior to use
  • At intervals not exceeding 30 days
  • After significant weather events
  • After any structural alteration

 

Scaffolds that are incomplete must be clearly barricaded and signed to prevent unauthorised access

 

 

 

 

Mobile Elevating Work Platforms (MEWPS)

Types of MEWPs

  • Boom type MEWPs
  • Scissor Lifts
  • Vertical Lifts
  • Vehicle mounted static boom

Ensure the MEWP is most suitable for the task and environment.

Risks associated with MEWPs include (but are not limited to):

  • Working in and around complex / overhead structures
  • Overturning
  • Dropped objects
  • Maneuvering scissor lifts through doorways
  • Weather conditions
  • Unqualified operators
  • Falls from heights
  • Working near overhead power lines
  • Poor ground conditions

 

 

 

 

 

 

Ladders

Straight and extension ladders must only be used as a means of access and/or egress.

 

Platform ladders with a platform height under 2M must only be used to perform inspections or carry out light duties. Platform ladders with a platform height of 2M or more must only be used if a risk assessment has determined a scaffold or MEWP is not reasonably practical.

 

Any ladder used on site must be industrial grade and compliant with AS/NZS 1892 Portable Ladder.

 

 

Guard (hand) rails

All guard rails must incorporate a top rail (between 900-1100mm above the working surface), mid rail and a toe board.

 

 

Fall prevention devices

A harness can only be used as a primary control if approved by the BU Operations Manager and a more effective control is not reasonably practical.

For more information on using a harness, see the guidance for GMR 5.C.

 

 

 

 

 

Related GMRs

5.2 Identify areas where falling object risks are present and implement appropriate control measures

5.3 Prevent persons and objects from falling through penetrations, shafts and risers

5.4 Only accept boom lifts fitted with secondary protection devices (SPDs)

5.A Do not remove or travel through any edge protection, barricade or exclusion zone unless authorised

5.C Only use a harness as a primary control if approved by the BU Operations Manager and a more effective control is not reasonably practical

7.3 Ensure temporary works are planned, assessed and approved by a competent person in accordance with the Temporary Works Risk Matrix


Related Procedures / Forms

Work at Height Procedure

Verification of Competency Procedure

Temporary Works Management Procedure

Mobile Scaffold General Scaffold Inspection Checklist

Static Scaffold General Scaffold Inspection Checklist

Working From Ladder Permit

Work at Height Permit


© John Holland Pty Ltd.

GMRs

  • Home
  • About the GMRs & this site
    • What are the GMRs?
    • What do the GMRs include?
    • Implementing the GMRs
    • Our GMR Videos
  • 1. Traffic, Plant & People
    • 1.1 Separating vehicles
    • 1.2 Overhead services and structures
    • 1.3 Pedestrian Separation
    • 1.4 Working in Operating Zones
    • 1.5 Fit for purpose plant
    • 1.6 Plant Modification
    • 1.A Licence and Verification
    • 1.B Road and rail rules
    • 1.C Seating position & seat-belts
    • 1.D Spotters
    • 1.E Operating zone permissions
    • 1.F Positioning plant
  • 2. Excavation & Trenching
    • 2.1 Excavation design
    • 2.2 Services and Structural Drawings
    • 2.3 Zone of Influence
    • 2.4 Barricading and Signage
    • 2.5 Services within 5m
    • 2.6 Tunnelling Controls
    • 2.A Positive Service Location
    • 2.B Access requirements
    • 2.C Safe Approach Distances
    • 2.D Excavation inspections
    • 2.E Preventing unauthorised access
  • 3. Lifting Operations
    • 3.1 Lift Competencies
    • 3.2 Lift Designer
    • 3.3 Ground Bearing Capacities
    • 3.4 Inspections & Maintenance
    • 3.5 Mobile plant load limits
    • 3.6 Lifting site inspection
    • 3.A Pre-Start Inspections
    • 3.B Mobile Plant used for lift
    • 3.C Exclusion zones
    • 3.D Suspended Loads
    • 3.E Competent Person(s)
  • 4. Electrical Safety
    • 4.1 Licences for Electrical Work
    • 4.2 Live electrical systems
    • 4.3 Safe System of Work
    • 4.4 Protective devices
    • 4.A Treat as Live
    • 4.B Legislative Requirements
    • 4.C Safe working distance
    • 4.D Electrical Supply Panels
  • 5. Work at Height
    • 5.1 Fall from height
    • 5.2 Falling objects
    • 5.3 Penetrations, shafts & risers
    • 5.4 EWP Protection Devices
    • 5.5 Grid Mesh / Chequer Plates
    • 5.A Barricades and exclusion zones
    • 5.B Overloading & adjustments
    • 5.C Harnesses
    • 5.D Installing roof sheeting
    • 5.E WAH Training
    • 5.F Accessing vehicles
  • 6. Wellbeing
    • 6.1 Wellbeing Risk Management
    • 6.2 Work rosters & Wellbeing programs
    • 6.3 Facility maintenance
    • 6.4 Occupational Hygiene
    • 6.5 AOD monitoring
    • 6.6 Wellbeing Champions
    • 6.A Be fit for work
    • 6.B Notify if unfit
    • 6.C Supportive work environment
    • 6.D Wellbeing Training
    • 6.E Know your Champions
    • 6.F Wellbeing Events
  • 7. Temporary Works
    • 7.1 Temporary Works Coordinator
    • 7.2 Temporary Works register
    • 7.3 TW Competencies
    • 7.4 Design Controls
    • 7.5 Temporary Work Protection
    • 7.6 Communication
    • 7.A Installation and Removal
    • 7.B Site validation
    • 7.C Working Load Limits
    • 7.D Inspection Schedule
    • 7.E Alterations
  • 8. Isolation
    • 8.1 Identifying Energy Sources
    • 8.2 Identifying Risks
    • 8.3 Isolations competencies
    • 8.4 Isolation Points
    • 8.5 Identifying Stored Energy
    • 8.A Test before touch
    • 8.B Releasing Stored Energy
    • 8.C Reviewing Isolation Status
    • 8.D Monitoring Isolation Controls
    • 8.E Re-instate guards
    • 8.F Personal Danger Tags/Locks
  • 9. Environmental Management
    • 9.1 Identifying risks
    • 9.2 Approvals/Licences/Permits
    • 9.3 Implementing Controls
    • 9.4 Identifying heritage, flora and fauna
    • 9.5 Minimising Resource Use
    • 9.6 Spoil and waste classification
    • 9.A Sensitive areas & boundaries
    • 9.B Dust, noise & vibration
    • 9.C Waste & hazardous substances
    • 9.D Maintaining / reviewing controls
    • 9.E Environmental findings
    • 9.F Water discharge
  • 10. Work on Rail
    • 10.1 Rail Competencies
    • 10.2 Qualified worker responsibilities
    • 10.3 Worksite Protection Risk Assessment
    • 10.4 Worksite Protection Plan
    • 10.5 Implement controls
    • 10.A Rail compliant PPE
    • 10.B Pre-work brief
    • 10.C Confirm protection controls
    • 10.D Network rules & safety instructions
    • 10.E Review Worksite Protection Plan
    • 10.F Rail certification
  • Knowledge Requirements
  • Glossary