5. Work at Height

5.B Do not overload, or make any adjustments to, working platforms or fall protection devices unless authorised

RISK – Plant rollover. Temporary Work collapse

You cannot gain authorisation to overload a working platform.

 

 

 

Working platforms include temporary work platforms, formwork, scaffold, ladders and MEWPs.  Authorisation can only be sought for adjusting a working platform.

 

 

An example of being authorised to adjust a working platform is a licensed scaffolder adjusting scaffold over 4m while contracted to do so at the workplace. 

 

 

For the alteration of any scaffold, ensure:

  • The scaffold designer is aware of any alterations
  • Only trained, competent people are making the alterations
  • Scaffold alterations are in accordance with the scaffold plan
  • Alterations do not compromise the structural integrity of the scaffold
  • Systems are in place to identify unauthorized interference with the scaffold

 

 

Containment sheeting should be installed on the internal face of the scaffold to reduce the potential for overloading the scaffold.

 

 

 

Scaffolding needs to be designed for the most adverse combination of dead, live and environmental loads that can reasonably be expected during the period that the scaffold is erected.

 

 

Environmental Loads

Environmental loads imposed by wind and rain may be heightened if perimeter containment screens, shade cloth or signs are attached to the scaffold.

 

 

Dead Loads

Refer to the self weight of the scaffold structure and components including any working, catch or access platforms, stairways, ladders, screens, sheeting, platform brackets, suspension ropes, ties or hoists.

 

 

Live loads

The live load includes the weight of people, materials (including debris, tools and equipment) and impact forces.

 

 

The working load limit is to be clearly marked on the scaffold tag and scaffold handover certificate:

 

 

Duty type

Design total load per platform

Minimum width of platform

Light Duty (<2m)

125kg (kN)

225 mm

Light Duty (≥2m)

225kg (2.2kN)

450 mm

Medium Duty

450kg (4.4kN)

900 mm

Heavy Duty

675kg (6.6kN)

1000 mm

 

 

Related GMRs

5.A Do not remove or travel through any edge protection, barricade or exclusion zone unless authorised

7.A Install and remove temporary works in accordance with the approved methodology and design documentation

7.C Do not exceed the specified working load limit of temporary works

7.E Alterations to installed temporary works can only be carried out following approval from the Temporary Works Coordinator


Related Procedures / Forms

Work at Height Procedure

Temporary Works Management Procedure

Mobile Scaffold General Scaffold Inspection Checklist

Static Scaffold General Scaffold Inspection Checklist

Scaffold Handover Certificate


© John Holland Pty Ltd.

GMRs

  • Home
  • About the GMRs & this site
    • What are the GMRs?
    • What do the GMRs include?
    • Implementing the GMRs
    • Our GMR Videos
  • 1. Traffic, Plant & People
    • 1.1 Separating vehicles
    • 1.2 Overhead services and structures
    • 1.3 Pedestrian Separation
    • 1.4 Working in Operating Zones
    • 1.5 Fit for purpose plant
    • 1.6 Plant Modification
    • 1.A Licence and Verification
    • 1.B Road and rail rules
    • 1.C Seating position & seat-belts
    • 1.D Spotters
    • 1.E Operating zone permissions
    • 1.F Positioning plant
  • 2. Excavation & Trenching
    • 2.1 Excavation design
    • 2.2 Services and Structural Drawings
    • 2.3 Zone of Influence
    • 2.4 Barricading and Signage
    • 2.5 Services within 5m
    • 2.6 Tunnelling Controls
    • 2.A Positive Service Location
    • 2.B Access requirements
    • 2.C Safe Approach Distances
    • 2.D Excavation inspections
    • 2.E Preventing unauthorised access
  • 3. Lifting Operations
    • 3.1 Lift Competencies
    • 3.2 Lift Designer
    • 3.3 Ground Bearing Capacities
    • 3.4 Inspections & Maintenance
    • 3.5 Mobile plant load limits
    • 3.6 Lifting site inspection
    • 3.A Pre-Start Inspections
    • 3.B Mobile Plant used for lift
    • 3.C Exclusion zones
    • 3.D Suspended Loads
    • 3.E Competent Person(s)
  • 4. Electrical Safety
    • 4.1 Licences for Electrical Work
    • 4.2 Live electrical systems
    • 4.3 Safe System of Work
    • 4.4 Protective devices
    • 4.A Treat as Live
    • 4.B Legislative Requirements
    • 4.C Safe working distance
    • 4.D Electrical Supply Panels
  • 5. Work at Height
    • 5.1 Fall from height
    • 5.2 Falling objects
    • 5.3 Penetrations, shafts & risers
    • 5.4 EWP Protection Devices
    • 5.5 Grid Mesh / Chequer Plates
    • 5.A Barricades and exclusion zones
    • 5.B Overloading & adjustments
    • 5.C Harnesses
    • 5.D Installing roof sheeting
    • 5.E WAH Training
    • 5.F Accessing vehicles
  • 6. Wellbeing
    • 6.1 Wellbeing Risk Management
    • 6.2 Work rosters & Wellbeing programs
    • 6.3 Facility maintenance
    • 6.4 Occupational Hygiene
    • 6.5 AOD monitoring
    • 6.6 Wellbeing Champions
    • 6.A Be fit for work
    • 6.B Notify if unfit
    • 6.C Supportive work environment
    • 6.D Wellbeing Training
    • 6.E Know your Champions
    • 6.F Wellbeing Events
  • 7. Temporary Works
    • 7.1 Temporary Works Coordinator
    • 7.2 Temporary Works register
    • 7.3 TW Competencies
    • 7.4 Design Controls
    • 7.5 Temporary Work Protection
    • 7.6 Communication
    • 7.A Installation and Removal
    • 7.B Site validation
    • 7.C Working Load Limits
    • 7.D Inspection Schedule
    • 7.E Alterations
  • 8. Isolation
    • 8.1 Identifying Energy Sources
    • 8.2 Identifying Risks
    • 8.3 Isolations competencies
    • 8.4 Isolation Points
    • 8.5 Identifying Stored Energy
    • 8.A Test before touch
    • 8.B Releasing Stored Energy
    • 8.C Reviewing Isolation Status
    • 8.D Monitoring Isolation Controls
    • 8.E Re-instate guards
    • 8.F Personal Danger Tags/Locks
  • 9. Environmental Management
    • 9.1 Identifying risks
    • 9.2 Approvals/Licences/Permits
    • 9.3 Implementing Controls
    • 9.4 Identifying heritage, flora and fauna
    • 9.5 Minimising Resource Use
    • 9.6 Spoil and waste classification
    • 9.A Sensitive areas & boundaries
    • 9.B Dust, noise & vibration
    • 9.C Waste & hazardous substances
    • 9.D Maintaining / reviewing controls
    • 9.E Environmental findings
    • 9.F Water discharge
  • 10. Work on Rail
    • 10.1 Rail Competencies
    • 10.2 Qualified worker responsibilities
    • 10.3 Worksite Protection Risk Assessment
    • 10.4 Worksite Protection Plan
    • 10.5 Implement controls
    • 10.A Rail compliant PPE
    • 10.B Pre-work brief
    • 10.C Confirm protection controls
    • 10.D Network rules & safety instructions
    • 10.E Review Worksite Protection Plan
    • 10.F Rail certification
  • Knowledge Requirements
  • Glossary