5. Work at Height

5.D Install roof sheeting from below or from a solid platform only after roof safety mesh and edge protection has been installed and signed off

RISK – Falls from height

Standing on already laid roof sheeting is an example of a solid platform.

 

 

 

Edge protection systems and safety mesh must be installed either from below or using temporary working platforms (such as MEWPs or scaffolding) and in accordance with the manufacturer’s instructions.

 

 

Safety mesh and edge protection must be inspected by a competent person to verify it has been installed as per the manufacturer’s instructions before roof access is approved and roof sheeting can commence. The Roof Safety Mesh/Edge Protection Handover Certificate (linked below) must be used to document this.

 

 

The safety in design review should consider the roof design to ensure safe access is provided via MEWPs or a solid platform (e.g. scaffold stairs).

In particular:

  • The insulation system used - avoid spacer systems if practical as they are a trip hazard and incompatible with progressive dry-lay of roof sheeting methodology
  • The widths and supports of box gutters - consider these carefully so they are safely trafficable
  • Expansion Joints - eliminate these where possible or consider their locations carefully as they increase the exposure to falls when loading and laying roof sheeting

 

Scaffold access stairs to roof

 

 

A methodology must be developed that provides a safe work area of stable and sound structure. One way this can be done is by progressively laying the sheets out so that installers and workers are working off the laid sheets.  Roof purlins should not be used as a permanent working platform for workers.

The methodology should detail:

  • Installation method for edge protections and safety mesh
  • Hold points for safety mesh and edge protection inspections and sign off
  • Roof access points and controls to prevent unauthorized access
  • Edge protection / guardrails
  • Laydown areas for materials and means of securing materials
  • Locations of exclusion zones
  • Laying sequence of insulation and roof sheets
  • Emergency rescue arrangements

 

 

Develop a roof loading plan highlighting:

  • Where roofing material will land so that workers do not have to walk on the purlins while laying roof sheets
  • Provisions for workers to dry lay the first pack of roof sheets without standing on unstable or narrow structures
  • After the first pack of roof sheets has been dry laid and screwed off, workers must be able to access subsequent packs without standing on unstable or narrow structures

Consideration should be given to landing packs along the roof in increments that do not exceed the amount of cover in that pack (e.g. 10 x 700mm cover sheets require packs to be spaced at 7m intervals).

Alternatively, sheets may be walked out over areas which have already been fixed down, however, this will increase the manual handling exposure.

 

 

When laying roof sheeting, consideration must be given to the width of the insulation material and spacers compared to the width of the roof sheeting.

 

When laying roof sheets, work from a principle of laying forward (from the leading edge) rather than backwards so workers are always standing on a solid platform.

 

 

Roof loading plans are used to plan works so that workers do not have to walk on purlins to get to the next pack of material.

 

 

There are a number of initial tasks that may require workers to walk on beams or purlins, however, these must be designed out if possible. These include:

  • Landing of roof sheets
  • Setting up string lines along the ends of roof sheets

Installation of purlin spaces – design out wherever possible by using other insulation systems (e.g. safe bridge).

 

 

If initially walking beams or purlins can not be eliminated, handrails must be provided to steady the worker.

 

 

2mm ring fixing used to secure safety mesh side lap. This exceed Australian Standards and minimises the risk of falls through the side lap.

 

 

Rolling out insulation from the dry laid roof sheet.

 

 

Related GMRs

5.1 Identify all tasks that present a potential fall from height of a person and implement appropriate control measures


Related Procedures / Forms

Work at Height Procedure

Roof Safety Mesh/Edge Protection Handover Certificate


© John Holland Pty Ltd.

GMRs

  • Home
  • About the GMRs & this site
    • What are the GMRs?
    • What do the GMRs include?
    • Implementing the GMRs
    • Our GMR Videos
  • 1. Traffic, Plant & People
    • 1.1 Separating vehicles
    • 1.2 Overhead services and structures
    • 1.3 Pedestrian Separation
    • 1.4 Working in Operating Zones
    • 1.5 Fit for purpose plant
    • 1.6 Plant Modification
    • 1.A Licence and Verification
    • 1.B Road and rail rules
    • 1.C Seating position & seat-belts
    • 1.D Spotters
    • 1.E Operating zone permissions
    • 1.F Positioning plant
  • 2. Excavation & Trenching
    • 2.1 Excavation design
    • 2.2 Services and Structural Drawings
    • 2.3 Zone of Influence
    • 2.4 Barricading and Signage
    • 2.5 Services within 5m
    • 2.6 Tunnelling Controls
    • 2.A Positive Service Location
    • 2.B Access requirements
    • 2.C Safe Approach Distances
    • 2.D Excavation inspections
    • 2.E Preventing unauthorised access
  • 3. Lifting Operations
    • 3.1 Lift Competencies
    • 3.2 Lift Designer
    • 3.3 Ground Bearing Capacities
    • 3.4 Inspections & Maintenance
    • 3.5 Mobile plant load limits
    • 3.6 Lifting site inspection
    • 3.A Pre-Start Inspections
    • 3.B Mobile Plant used for lift
    • 3.C Exclusion zones
    • 3.D Suspended Loads
    • 3.E Competent Person(s)
  • 4. Electrical Safety
    • 4.1 Licences for Electrical Work
    • 4.2 Live electrical systems
    • 4.3 Safe System of Work
    • 4.4 Protective devices
    • 4.A Treat as Live
    • 4.B Legislative Requirements
    • 4.C Safe working distance
    • 4.D Electrical Supply Panels
  • 5. Work at Height
    • 5.1 Fall from height
    • 5.2 Falling objects
    • 5.3 Penetrations, shafts & risers
    • 5.4 EWP Protection Devices
    • 5.5 Grid Mesh / Chequer Plates
    • 5.A Barricades and exclusion zones
    • 5.B Overloading & adjustments
    • 5.C Harnesses
    • 5.D Installing roof sheeting
    • 5.E WAH Training
    • 5.F Accessing vehicles
  • 6. Wellbeing
    • 6.1 Wellbeing Risk Management
    • 6.2 Work rosters & Wellbeing programs
    • 6.3 Facility maintenance
    • 6.4 Occupational Hygiene
    • 6.5 AOD monitoring
    • 6.6 Wellbeing Champions
    • 6.A Be fit for work
    • 6.B Notify if unfit
    • 6.C Supportive work environment
    • 6.D Wellbeing Training
    • 6.E Know your Champions
    • 6.F Wellbeing Events
  • 7. Temporary Works
    • 7.1 Temporary Works Coordinator
    • 7.2 Temporary Works register
    • 7.3 TW Competencies
    • 7.4 Design Controls
    • 7.5 Temporary Work Protection
    • 7.6 Communication
    • 7.A Installation and Removal
    • 7.B Site validation
    • 7.C Working Load Limits
    • 7.D Inspection Schedule
    • 7.E Alterations
  • 8. Isolation
    • 8.1 Identifying Energy Sources
    • 8.2 Identifying Risks
    • 8.3 Isolations competencies
    • 8.4 Isolation Points
    • 8.5 Identifying Stored Energy
    • 8.A Test before touch
    • 8.B Releasing Stored Energy
    • 8.C Reviewing Isolation Status
    • 8.D Monitoring Isolation Controls
    • 8.E Re-instate guards
    • 8.F Personal Danger Tags/Locks
  • 9. Environmental Management
    • 9.1 Identifying risks
    • 9.2 Approvals/Licences/Permits
    • 9.3 Implementing Controls
    • 9.4 Identifying heritage, flora and fauna
    • 9.5 Minimising Resource Use
    • 9.6 Spoil and waste classification
    • 9.A Sensitive areas & boundaries
    • 9.B Dust, noise & vibration
    • 9.C Waste & hazardous substances
    • 9.D Maintaining / reviewing controls
    • 9.E Environmental findings
    • 9.F Water discharge
  • 10. Work on Rail
    • 10.1 Rail Competencies
    • 10.2 Qualified worker responsibilities
    • 10.3 Worksite Protection Risk Assessment
    • 10.4 Worksite Protection Plan
    • 10.5 Implement controls
    • 10.A Rail compliant PPE
    • 10.B Pre-work brief
    • 10.C Confirm protection controls
    • 10.D Network rules & safety instructions
    • 10.E Review Worksite Protection Plan
    • 10.F Rail certification
  • Knowledge Requirements
  • Glossary