I will support the safe delivery of temporary works
7.1 Appoint a Temporary Works Coordinator for pre-contracts and project delivery
7.2 Identify, adequately scope and capture Temporary Works in the Temporary Works Register
7.3 Ensure temporary works are planned, assessed and approved by a competent person
7.4 Identify appropriate design controls and minimum design documentation based on the temporary works risk category
7.5 Protect temporary works from accidental impact through physical means or through the provision of suitable impact loading in the design
7.6 Ensure temporary works design, installation and removal requirements and loading limits are communicated to any persons delivering temporary works
7.A Install and remove temporary works in accordance with the approved methodology and design documentation
7.B Complete a site validation prior to the initial use of temporary works
7.C Do not exceed the specified working load limit of temporary works
7.D Implement a temporary work inspection schedule for all temporary works
7.E Alterations to installed temporary works can only be carried out following approval from the Temporary Works Coordinator