RISK – Temporary Work failure
These requirements and loading limits should be captured in the AMS and specified within the Temporary Work documentation.
These requirements must also be communicated to all persons involved in the relevant temporary works during the AMS workshops.
Workers delivering temporary work must also be engaged during the development of the construction methodology and Task Risk Assessment.