9. Environmental Management

9.3 Implement all drainage, sediment, erosion, spill response and water quality controls prior to commencing work

RISK – Impact to surrounding communities, pollution of the environment and receiving water bodies

The approach to erosion and sediment control measures should be documented in the Water Quality Erosion and Sediment ECP and identified on the Erosion and Sediment Control Plan (ESCP).

 

 

 

  • Clean water diversions are used to channel water not linked to the project away from the worksite.
  • Examples of controls include soil berms, swales, drains and pipe diversions.
  • Diverting water away from works reduces the amount of turbid water that must be captured, filtered, treated and disposed of from site.

 

 

  • Clean water diversions should be implemented prior to commencing works.
  • Implement a program to regularly inspect and maintain the controls.
  • Continue to assess the need to upgrade/change controls to ensure they remain suitable as works progress or new work areas are established.

 

 

 

  • The installation of an upslope water diversion, such as this swale drain, reduces the amount of water entering the work area by directing it away from site.

 

 

 

  • Designs of temporary creek crossings  should allow for water to flow through the site without entering the work area.

 

 

  • Selection of ancillary facilities, plant lay-down , maintenance and refuelling areas, stockpiles or chemical storage must consider the risk of pollution from spills and avoid areas that drain toward water bodies and stormwater drains.

 

 

  • Areas of exposed earth must have erosion and sediment controls designed, installed and maintained as per the relevant requirements.
  • Controls must be regularly inspected and maintained for effectiveness, including revision where major changes to works occur.

The following flowchart should be used as a guide to assist in selecting the most appropriate erosion and sediment controls for your workplace.

 

 

Whilst the above gives you an indication of which controls are suited to specific conditions, please note that each control or a combination of these controls can be used for multiple situations and should not be looked at in isolation.

 

 

 

Example of polymer application.

 

 

 

Example of a lined check dam.

 

 

 

Example of a sediment fence. Controls shall be installed by a suitably trained or competent individual.

 

 

 

Example of a sediment basin. Physical controls must be in place to ensure bottom sediment is not discharged during dewatering.

 

 

 

Spill kits must be located where chemicals and fuelled plant or equipment is being stored, operated or maintained.

Inspect spill kits regularly to make sure they are in date, fully stocked and ready for use.

 

 

 

 

Used items from spill kits must be disposed of as contaminated waste along with any contaminated soil or materials.

 

 

 

Controls must also be in place to prevent tracking dirt and mud onto roads.

Where stabilised vehicle exits are required, appropriate controls such as crushed rock, rumble grids and/or wheel wash facilities are required to avoid mud tracking onto roadways.

 

 

 

Strategies for progressive rehabilitation of the site should be employed once works are completed in an area.

Progressive rehabilitation helps manage run-off and sediment from exposed areas.

 

 

Related GMRs

9.1 Identify environment risks in the planning phase and allocate appropriate controls and resources

9.B Minimise dust, noise and vibration at all times and work within approved site working hours

9.D Maintain and review drainage, erosion and sediment controls as works progress


Related Procedures / Forms

Environment Planning Procedure

Clearing Management Procedure

Erosion and Sediment Control Procedure

Water Discharge Procedure

Hazardous Chemical Management Procedure


© John Holland Pty Ltd.

GMRs

  • Home
  • About the GMRs & this site
    • What are the GMRs?
    • What do the GMRs include?
    • Implementing the GMRs
    • Our GMR Videos
  • 1. Traffic, Plant & People
    • 1.1 Separating vehicles
    • 1.2 Overhead services and structures
    • 1.3 Pedestrian Separation
    • 1.4 Working in Operating Zones
    • 1.5 Fit for purpose plant
    • 1.6 Plant Modification
    • 1.A Licence and Verification
    • 1.B Road and rail rules
    • 1.C Seating position & seat-belts
    • 1.D Spotters
    • 1.E Operating zone permissions
    • 1.F Positioning plant
  • 2. Excavation & Trenching
    • 2.1 Excavation design
    • 2.2 Services and Structural Drawings
    • 2.3 Zone of Influence
    • 2.4 Barricading and Signage
    • 2.5 Services within 5m
    • 2.6 Tunnelling Controls
    • 2.A Positive Service Location
    • 2.B Access requirements
    • 2.C Safe Approach Distances
    • 2.D Excavation inspections
    • 2.E Preventing unauthorised access
  • 3. Lifting Operations
    • 3.1 Lift Competencies
    • 3.2 Lift Designer
    • 3.3 Ground Bearing Capacities
    • 3.4 Inspections & Maintenance
    • 3.5 Mobile plant load limits
    • 3.6 Lifting site inspection
    • 3.A Pre-Start Inspections
    • 3.B Mobile Plant used for lift
    • 3.C Exclusion zones
    • 3.D Suspended Loads
    • 3.E Competent Person(s)
  • 4. Electrical Safety
    • 4.1 Licences for Electrical Work
    • 4.2 Live electrical systems
    • 4.3 Safe System of Work
    • 4.4 Protective devices
    • 4.A Treat as Live
    • 4.B Legislative Requirements
    • 4.C Safe working distance
    • 4.D Electrical Supply Panels
  • 5. Work at Height
    • 5.1 Fall from height
    • 5.2 Falling objects
    • 5.3 Penetrations, shafts & risers
    • 5.4 EWP Protection Devices
    • 5.5 Grid Mesh / Chequer Plates
    • 5.A Barricades and exclusion zones
    • 5.B Overloading & adjustments
    • 5.C Harnesses
    • 5.D Installing roof sheeting
    • 5.E WAH Training
    • 5.F Accessing vehicles
  • 6. Wellbeing
    • 6.1 Wellbeing Risk Management
    • 6.2 Work rosters & Wellbeing programs
    • 6.3 Facility maintenance
    • 6.4 Occupational Hygiene
    • 6.5 AOD monitoring
    • 6.6 Wellbeing Champions
    • 6.A Be fit for work
    • 6.B Notify if unfit
    • 6.C Supportive work environment
    • 6.D Wellbeing Training
    • 6.E Know your Champions
    • 6.F Wellbeing Events
  • 7. Temporary Works
    • 7.1 Temporary Works Coordinator
    • 7.2 Temporary Works register
    • 7.3 TW Competencies
    • 7.4 Design Controls
    • 7.5 Temporary Work Protection
    • 7.6 Communication
    • 7.A Installation and Removal
    • 7.B Site validation
    • 7.C Working Load Limits
    • 7.D Inspection Schedule
    • 7.E Alterations
  • 8. Isolation
    • 8.1 Identifying Energy Sources
    • 8.2 Identifying Risks
    • 8.3 Isolations competencies
    • 8.4 Isolation Points
    • 8.5 Identifying Stored Energy
    • 8.A Test before touch
    • 8.B Releasing Stored Energy
    • 8.C Reviewing Isolation Status
    • 8.D Monitoring Isolation Controls
    • 8.E Re-instate guards
    • 8.F Personal Danger Tags/Locks
  • 9. Environmental Management
    • 9.1 Identifying risks
    • 9.2 Approvals/Licences/Permits
    • 9.3 Implementing Controls
    • 9.4 Identifying heritage, flora and fauna
    • 9.5 Minimising Resource Use
    • 9.6 Spoil and waste classification
    • 9.A Sensitive areas & boundaries
    • 9.B Dust, noise & vibration
    • 9.C Waste & hazardous substances
    • 9.D Maintaining / reviewing controls
    • 9.E Environmental findings
    • 9.F Water discharge
  • 10. Work on Rail
    • 10.1 Rail Competencies
    • 10.2 Qualified worker responsibilities
    • 10.3 Worksite Protection Risk Assessment
    • 10.4 Worksite Protection Plan
    • 10.5 Implement controls
    • 10.A Rail compliant PPE
    • 10.B Pre-work brief
    • 10.C Confirm protection controls
    • 10.D Network rules & safety instructions
    • 10.E Review Worksite Protection Plan
    • 10.F Rail certification
  • Knowledge Requirements
  • Glossary